Report 13/2026: Near miss with a member of ground staff at Washwood Heath
A near miss between a freight train and a ground staff member at Washwood Heath on 18 September 2025 prompted a safety investigation by RAIB, identifying procedural failures in risk management and incident response.
At approximately 07:19 on 18 September 2025, a freight train traveling at 36 mph (58 km/h) narrowly avoided a ground staff operative (GSO) conducting a safety check near the Up Derby Slow line at Washwood Heath, Birmingham. The GSO was positioned between a stationary train and the approaching freight train, prompting the driver to sound the horn as a warning. The GSO moved to safety behind the stationary train just 4 to 5 seconds before the freight train passed, avoiding injury or damage.
RAIB’s investigation concluded that the GSO was in an unsafe location due to the absence of an appropriate safe system of work for conducting the safety examination outside the freight terminal. The report also found that Freightliner had not effectively managed the risks associated with this activity at the location, contributing to the incident.
The investigation further identified that the required process for drug and alcohol testing of staff involved in the incident was not followed, in violation of rail industry standards. RAIB noted this as a procedural lapse that could have broader implications for safety protocols.
As a result of the findings, RAIB issued one recommendation to Freightliner Limited to improve processes for train preparation activities outside terminals and depots. The agency also issued two learning points to emphasize reporting unsafe conditions and adhering to post-incident testing requirements.