OFICIAL NASA News Releases

Artemis III Astronaut Andre Douglas Visits VAB

What happened
Based on NASA News Releases · Nov 27, 2026

NASA astronaut Andre Douglas toured the Vehicle Assembly Building at Kennedy Space Center, previewing Artemis III’s propulsion systems ahead of the lunar mission.

Artemis III Astronaut Andre Douglas Visits VAB
NASA News Releases — NASA
Key points
·
Andre Douglas inspected an RS-25 engine test article at Kennedy Space Center on November 17, 2026.
·
Artemis III will use four RS-25 engines to power the SLS core stage carrying Orion.
·
Rendezvous and docking tests with lunar lander systems will occur in low Earth orbit before Artemis IV.
Key numbers
·
NASA astronaut Andre Douglas, assigned to the Artemis III mission, inspected an RS-25 engine test article inside the Vehicle Assembly Building at Kennedy Space Center in Florida on November 17, 2026.
·
The visit highlighted preparations for the SLS rocket’s core stage, which will use four RS-25 engines to launch the Orion spacecraft.
·
During Artemis III, the SLS rocket’s core stage powered by the RS-25 engines will carry Orion into low Earth orbit, where it will conduct rendezvous and docking tests with lunar lander systems.

NASA astronaut Andre Douglas, assigned to the Artemis III mission, inspected an RS-25 engine test article inside the Vehicle Assembly Building at Kennedy Space Center in Florida on November 17, 2026. The visit highlighted preparations for the SLS rocket’s core stage, which will use four RS-25 engines to launch the Orion spacecraft.

During Artemis III, the SLS rocket’s core stage powered by the RS-25 engines will carry Orion into low Earth orbit, where it will conduct rendezvous and docking tests with lunar lander systems. These tests are designed to validate critical operations before astronauts return to the lunar surface on subsequent missions.

Douglas’s presence underscores NASA’s ongoing readiness checks for Artemis III, ensuring all systems meet the mission’s technical and safety requirements. The Vehicle Assembly Building serves as a key facility for integrating and testing flight hardware ahead of launch.

The RS-25 engines, repurposed from the Space Shuttle program, have been upgraded for the SLS rocket to provide the necessary thrust for deep space missions. This visit reflects NASA’s phased approach to lunar exploration, building on prior Artemis missions to establish sustainable operations.

Original source → Deals on Clipraptor.com →